Categories: NEWS

Building Collapses In Rivers, Claims One Life

In the Egbelu Mgbaraja, Obio/Akpor LGA, Rivers State, a two-story building that was still under construction collapsed on Monday, killing 1 person.

The incident, which occurred around 2 p.m. on Monday, is the second building collapse in the area within a week.

Eyewitness Jonathan Obey said the building gave way while construction workers were on the second floor, tragically claiming the life of a young man identified simply as Udeme from Akwa Ibom State.

Another worker narrowly escaped death but sustained serious injuries. Obey blamed the incident on the use of substandard materials, describing the foundation and supports as inadequate.

“When we came, we noticed that substandard materials were used in the construction. The building’s foundation was for a two-storey structure, yet low-quality rods and insufficient cement were used. The decking lacked a centre pillar and beam, which ultimately led to the collapse,” Obey explained.

In response, Rivers State Commissioner for Physical Planning and Urban Development, Evans Bipi, visited the site, ordered it sealed, and declared what the developer wanted.

Bipi condemned the developer’s negligence, stating that construction was carried out without government approval and with substandard materials.

“We’ve made it clear that if you build without approval, you will face the consequences.

“This site is sealed, and the developer has been declared wanted. He must answer for using substandard materials that led to the loss of life,” Bipi said.

Sponsored

Continuing, Bipi warned that the government would take strong action. “This is unacceptable. We must use him as an example,” he added.

In a statement by his media aide, Emeka Idika Kalu, Bipi expressed sympathy to the victim’s family, stating that the remains would be kept at a mortuary, which would be publicly disclosed for family access.

“This incident must serve as a warning to those building without government approval,” Bipi stated.

The Rivers State Commissioner for Special Duties, Samuel Anya, also expressed dismay over the incident, condemning the developer’s prioritization of profit over safety.

“This is heartbreaking. Not only was the building of poor quality, but it also lacked proper approval. Someone has now paid the price with his life.

“The owner and engineer responsible must be held accountable as the government prioritizes the safety of lives,” Anya said.

SPONSORED
Victor Alade

Recent Posts

EFCC Breaks Silence On VeryDarkMan’s Arrest

The Economic and Financial Crimes Commission (EFCC) has confirmed the arrest of Martins Innocent Otse…

3 minutes ago

Nnamdi Kanu’s Trial: Court Adjourns Till May 7 As Defense, Prosecution Clash Over Documents [VIDEO]

The trial of the detained leader of the Indigenous People of Biafra (IPOB), Mazi Nnamdi…

34 minutes ago

Tinubu Endorse $122bn Power Investments Plan

President Bola Tinubu has approved the National Integrated Electricity Policy, formally ratifying and adopting a…

1 hour ago

Nnadozie’s Penalty Heroics Cost PSG Coach Job

PSG, the former feminine champions of the Coupe de France, fired head coach Fabrice Abriel…

1 hour ago

”Man United Hold Talks With Osimhen’s Agent” – Report

Manchester United has begun talks with the agents of Nigerian striker Victor Osimhen as the…

1 hour ago

”Women, Youth Crucial To Ending Food Insecurity” – Oluremi Tinubu

Sen. Oluremi Tinubu, the wife of President Bola Tinubu, called on women and young people…

1 hour ago